Project name: Shanghai Yangtze River Bridge Modal Force Test

Views: 900 Author: Site Editor Publish Time: Origin: Site

Project name: Shanghai Yangtze River Bridge Modal Force Test

Brief introductionBefore the Shanghai Yangtze River Bridge was put into use in 2011, Tongji University used DE5907A to perform modal experiments for the full bridge (including the bridge tower), and confirmed that the frequency, vibration type is basically same as designed. Using the DE5906B to test the cable tension of the stay cable, it is almost the same as the calculated cable force at the time of design. The safety of the bridge was verified through experiments.

Shanghai-Yangtze-River-Bridge-Modal-Force-Test

×

Contact Us