Project name: Structure performance test of large-scale granulator
Brief introduction: Yanshan Petrochemical retrofits and upgrades the existing granulator equipment. To ensure the stable operation of the granulator after transformation, the granulator equipment supplier shall test the working conditions of key parts of the equipment, not only to ensure stable operation, and also provide data support for future improvement of the equipment. In this test, shaft torque, displacement, and vibration of each part were tested respectively. Finally, reliable test data was obtained, which provided a basis for subsequent analysis.